Procedures, licenses and permits

Planning

Geometric track design

We make geometric designs of roads for real estate projects in Medellin, this design must be approved by the administrative department of planning and is a requirement to obtain the construction license.

mobility studies

We develop mobility studies for real estate projects in Medellín, where we find the necessary traffic capacity so that a project does not generate mobility problems in the sector.

public space design

We design public spaces for real estate projects in Medellín, where we seek to guarantee the accessibility and pedestrian connectivity of the project with its immediate surroundings.

normative concept

We manage with planning and interpret the feasibility of a real estate project in Medellin, offering optimal solutions to the state of the property to ensure efficient and profitable developments.

Avoid bad paperwork or delays that can cost you time and money.
Call us at 310 425 49 00

Do you have a question?

FAQ

If you have any other questions please do not hesitate to contact us at 3104254900.

Once you receive the Resolution of notification of collection, you have 10 working days to respond to the administration that you wish to pay your urban obligations in Medellin compensating with qualified land (which we will help you get), If you do not respond before 10 working days, the municipal administration will issue an invoice for the total plus 15% of surcharge, which from that moment, can only be paid in money and you can not compensate with land.

Although the payment of the compensation in urban obligations in Medellín does not generate any type of interest, the total value tends to increase between 5-7% annually because it is calculated with the value of the square meter of the geoeconomic zone to which the construction license granted belongs. This payment is not a tax and has no expiration date, therefore we recommend not to extend this payment.

It is a reduced number of lots authorized only by the municipality of Medellín, which must go through more than 50 regulatory, technical and legal processes during several years that allow the property and its owner to comply with all the requirements to develop a public space project in order to compensate urban planning obligations in Medellín.

MACCA | PDF DOWNLOAD 3

Planning Checklist

Verify that you have all relevant documentation using this checklist.

Compare listings

Compare