In hospitality, as in so many other sectors, the rules change when you move from theory to execution. For ten years at Macca we have developed real estate projects in different lines: housing, retail, urban planning and hotels. But only after experimenting directly with different operating schemes did we understand that, for a hotel to be a profitable asset, the operator is...

MACCA | Screenshot 2025 04 07 at 5.19.32 p. m

URBIT GARDEN CONSTRUCTION PROGRESS: FEBRUARY 2025

The beginnings are not always seen, but they are always felt in the structure. In February, Urbit Garden made progress in the technical preparation for its deep foundation. The installation of the perimeter enclosures was completed, the general ground excavation began and the first excavations for the foundation of the piles were carried out. The foundation trenches, the foundation walls, and the foundation walls were also completed.

MACCA | IMAGE PREVIEW

WORK PROGRESS: START-UP 2025

https://youtu.be/QMOe1Q8Rk8s?si=mDS_rwbMU3wsLDtu The year began on site. From the first working day, MACCA's creative and technical team visited three of the projects that will mark the immediate future of the hotel operation in Medellín: RYO53, Action Living and Urbit Garden. This tour was documented on video and can be seen in full at the end of this article. RYO53: beginning...

MACCA | ChatGPT Image 7 Apr 2025 05 15 23 p.m.

URBIT GARDEN CONSTRUCTION PROGRESS: SEPTEMBER 2024

On site, major advances are not always visible from the outside. But from the inside, everything changes. During September, Urbit Garden continued to advance in its deep foundation stage. It reached 100% in the pouring of foundation piles, a structural milestone that allows for the reinforcement of foundation beams and the start of columns. This process is already underway and will mark the...

MACCA | ChatGPT Image 6 Apr 2025 03 11 52 p.m.

ACTION LIVING CONSTRUCTION PROGRESS: JULY 2024

It is not just another stage. It is the moment when the building begins to take shape. July marked a key breakthrough for the Action Living project: the basement slab is already poured on a 50%, and the reinforcement of the remaining 50% is in its final phase. In parallel, the pouring of the basement columns has been completed, preparing the structural ground to start with the second floor slab. This...

MACCA | WhatsApp Image 2024 06 14 at 8.58.07 PM

FRAQ Fractional Investments: A Different Approach to INVESTING in Wellcomm Hotel & Spa

Discover how Fraq is revolutionizing real estate investment with its innovative fractional investment model. In our podcast, Jorge García and Nicolás Varón tell us how they combine profitability and lifestyle, and their collaboration with Welcome Hotel & Spa. Don't miss this interesting conversation! https://youtu.be/31QU7JjsoG8 Introduction The podcast begins with...

MACCA | Screenshot 2025 04 04 at 3.32.21 p. m

ACTION LIVING CONSTRUCTION PROGRESS: MAY 2024

When the ground is prepared, the real construction begins. May marked a symbolic and engineering closure: 100% of earthwork was completed. A process that usually goes unnoticed, but which is decisive. Earthworks, ground shaping, perimeter enclosures. Everything is ready. Everything firm. Everything ready to start lifting. With 13 of the 15 foundation piles already...

MACCA | ChatGPT Image 4 Apr 2025 03 27 07 p.m.

ACTION LIVING CONSTRUCTION PROGRESS: APRIL 2024

Foundations are not only built with concrete. They are also built with precision, coordination and confidence. During April, Action Living reached a new level of technical consolidation. Enclosure work reached 95% and foundation pile excavations are progressing steadily, accumulating 60% of pours. The foundation beams, meanwhile, have been excavated at a rate of...

MACCA | ChatGPT Image 4 Apr 2025 03 04 55 p.m.

ACTION LIVING CONSTRUCTION PROGRESS: FEBRUARY 2024

First came the vision. Then, the license. Today, the ground is already being transformed. February was the month in which Action Living's work went from paper to underground. We finished the earthworks - an invisible stage for many, but fundamental for everyone - and we moved forward with the deep excavations that will support the building's structure. The piles are already forming, and with them,...

MACCA : PXL 20240112 165009583

ACTION LIVING CONSTRUCTION PROGRESS: JANUARY 2024

Every project has a point of no return. And Action Living reached it on January 10. On that day, the construction phase officially began: machinery on site, plans being executed and a vision that is beginning to become a reality. With the executed note of the construction license in hand, and the conditions of the transfer fulfilled before the trustee, the project entered its active phase. It is...