URBIT GARDEN CONSTRUCTION PROGRESS: FEBRUARY 2025

MACCA | Screenshot 2025 04 07 at 5.19.32 p. m

The beginnings are not always seen, but they are always felt in the structure.

In February, Urbit Garden advanced the technical preparation for its deep foundation. The installation of the perimeter enclosuresthe general land clearing and the first excavations for pile foundations.

The following were also executed foundation trenchesthe lateral retaining walls and the general cleaning of the siteleaving everything ready for the start of the structural work.

This is the moment when the project changes phase: from the adaptation of the land to the definitive foundation. The moment when the invisible begins to support what is to come.

Urbit Garden is located in the heart of Laureles, and every meter dug here responds to a model of hotel operation with technical design, clear product and focus on profitability.

From MACCA we will continue to report the progress with the same rigorousness with which it is built: step by step, without shortcuts.

-

MACCA Team

Join The Discussion

Compare listings

Compare