{"id":26365,"date":"2025-03-06T17:16:00","date_gmt":"2025-03-06T22:16:00","guid":{"rendered":"https:\/\/macca.com.co\/?p=26365"},"modified":"2026-03-02T17:16:07","modified_gmt":"2026-03-02T22:16:07","slug":"avance-de-obra-urbit-garden-febrero-2024","status":"publish","type":"post","link":"https:\/\/macca.com.co\/fr\/avance-obra\/avance-de-obra-urbit-garden-febrero-2024\/","title":{"rendered":"AVANCEMENT DE LA CONSTRUCTION DU JARDIN URBIT : F\u00c9VRIER 2025"},"content":{"rendered":"<p>Les d\u00e9buts ne sont pas toujours visibles, mais ils sont toujours ressentis dans la structure.<\/p>\n\n\n\n<p>En f\u00e9vrier, Urbit Garden a progress\u00e9 dans la pr\u00e9paration technique de ses fondations profondes. L'installation des <strong>enceintes p\u00e9rim\u00e9triques<\/strong>Le <strong>d\u00e9frichement g\u00e9n\u00e9ral<\/strong> et le <strong>premi\u00e8res fouilles<\/strong> pour les fondations sur pieux.<\/p>\n\n\n\n<p>Les \u00e9l\u00e9ments suivants ont \u00e9galement \u00e9t\u00e9 mis en \u0153uvre <strong>tranch\u00e9es de fondation<\/strong>les <strong>murs de sout\u00e8nement lat\u00e9raux<\/strong> et le <strong>nettoyage g\u00e9n\u00e9ral du site<\/strong>Le projet est maintenant pr\u00eat pour le d\u00e9but des travaux structurels.<\/p>\n\n\n\n<p>C'est le moment o\u00f9 le projet change de phase : de l'adaptation du terrain aux fondations d\u00e9finitives. Le moment o\u00f9 l'invisible commence \u00e0 soutenir l'avenir.<\/p>\n\n\n\n<p>Urbit Garden est situ\u00e9 au c\u0153ur de Laureles, et chaque m\u00e8tre creus\u00e9 ici r\u00e9pond \u00e0 un mod\u00e8le d'exploitation h\u00f4teli\u00e8re avec une conception technique, un produit clair et une concentration sur la rentabilit\u00e9.<\/p>\n\n\n\n<p>Le MACCA continuera \u00e0 rendre compte des progr\u00e8s accomplis avec la m\u00eame rigueur que celle qui a pr\u00e9sid\u00e9 \u00e0 sa construction : pas \u00e0 pas, sans raccourcis.<\/p>\n\n\n\n<p>-<\/p>\n\n\n\n<p><strong>L'\u00e9quipe MACCA<\/strong><\/p>","protected":false},"excerpt":{"rendered":"<p>Los inicios no siempre se ven, pero siempre se sienten en la estructura. En febrero, Urbit Garden avanz\u00f3 en la preparaci\u00f3n t\u00e9cnica para su cimentaci\u00f3n profunda. Se finaliz\u00f3 la instalaci\u00f3n de los recintos perimetrales, se inici\u00f3 el cajeo general del terreno y se realizaron las primeras excavaciones para la cimentaci\u00f3n de las pilas. Tambi\u00e9n se [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":26366,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[387,389],"tags":[],"class_list":["post-26365","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-avance-obra","category-urbit-garden"],"_links":{"self":[{"href":"https:\/\/macca.com.co\/fr\/wp-json\/wp\/v2\/posts\/26365","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/macca.com.co\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/macca.com.co\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/macca.com.co\/fr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/macca.com.co\/fr\/wp-json\/wp\/v2\/comments?post=26365"}],"version-history":[{"count":2,"href":"https:\/\/macca.com.co\/fr\/wp-json\/wp\/v2\/posts\/26365\/revisions"}],"predecessor-version":[{"id":26368,"href":"https:\/\/macca.com.co\/fr\/wp-json\/wp\/v2\/posts\/26365\/revisions\/26368"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/macca.com.co\/fr\/wp-json\/wp\/v2\/media\/26366"}],"wp:attachment":[{"href":"https:\/\/macca.com.co\/fr\/wp-json\/wp\/v2\/media?parent=26365"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/macca.com.co\/fr\/wp-json\/wp\/v2\/categories?post=26365"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/macca.com.co\/fr\/wp-json\/wp\/v2\/tags?post=26365"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}